Fountain pump equipment after the completion of the debugging work

With the development of society, the fountain has become an indispensable part of urban construction, when the fountain pump equipment is installed, how should the equipment debugging work?
1. Check before power-on
Before powering the installation environment should check whether the requirements, fountain pump equipment is damaged, wiring or loose, off. Check the switch, wire diameter, connection, configuration is safe, the layout is reasonable.
2. Debugging
Debugging work, pay attention to the fountain pump is not through the inverter access to the bottom of the three-phase leakage switch, with three-phase AC direct start. If there is internal leakage, short circuit and other issues, timely treatment, troubleshooting.
3. Connect the fountain pump to the inverter. On the control panel of the inverter, the function code is set to 50Hz, and then the frequency is gradually increased from small to observe whether the inverter and fountain pump are abnormal.
4. Fountain If the water is not high, you need to re-adjust the water nozzle jet and flow, only in the device to re-set the target frequency can be.
In addition to fountain pump inspection, also need to pay attention to underwater lights debugging. Pay attention to whether the water into the water, the first to each channel lights connected to the bottom of the leakage switch, all the way to brighten the underwater lights, lights and timely replacement, and then access the light controller, fine-tune the lighting control effect.
Debugging work is correct, you can rest assured that the operation