Deep well submersible pump installation
(1) First of all, install a pump tube in the pump outlet, and clamped with a clamp, hanging down into the well, the splint is located in the well stage.
(2) and then a pair of clamping plate clamp another section of the water pipe. Then lift, lower and then connected to the flange of the flange connected with the pad, when the screws must be diagonal at the same time. Raise the lifting chain to remove the first clamping plate, so that the pump down the splint and fell on the well stage. Repeat installation, go down, until all Zhuangwan, put the covers, the last pair of splints will not be demolished on the covers.
(3) installation of elbow, gate valve, outlet, etc., and add the appropriate pad seal.
(4) cable to be fixed in the water pipe flange groove, each section with a rope fixed, down the process to be careful not to bruise the cable.
(5) under the deep well pump if the process of jamming phenomenon, to overcome the card point, can not force the next pump, so as not to die.
(6) installation is strictly prohibited personnel down the job.
(7) protection switch and starting equipment should be installed in the user's power distribution board, the distribution board has a voltmeter, ammeter, light, and placed in the well room in place.
(8) the use of "with a wire from the motor base to the pump tube bundled," the force of protection measures to prevent accidents.