When we use the submersible pump, the use of the submersible pump the entire unit, submersible pump unit installation is how to install it? The following by the Shanghai Submersible Pump manufacturers and we say, we want to help:
First, the pump outlet to install a pump tube, and clamped with a clamp, hanging down into the well, so that the splint is located in the well stage.
Second, a pair of plywood and then clamped another section of water pipes. Then lift, lower and then connected to the flange of the flange connected with the pad, the screw must be diagonal at the same time. Raise the lifting chain to remove the first clamping plate, so that the pump down the splint and fell on the well stage. Repeat installation, go down, until all Zhuangwan, put the covers, the last pair of splints will not be demolished on the covers.
Third, the installation of elbow, gate valve, outlet, etc., and add the appropriate pad seal.
Fourth, the cable to be fixed in the groove on the water pipe flange, no section with a rope fixed, down the process to be careful not to bruise the cable.
Fifth, the process of the next pump, if the card is not the main phenomenon, then we must find ways to overcome the card point, can not force the next pump, in order to prevent being stuck.
Sixth, the installation is strictly prohibited personnel down the job.
Seventh, the protective switch and starting equipment should be installed in the user’s distribution board, the distribution board has a voltmeter, ammeter, light, and placed in the well room in place.
Eighth, the use of “wire from the motor base to the pump tube bundled,” the force of protection measures, in order to prevent accidents from happening.